zaterdag 9 juli 2011

Characteristics of work instructions

Have a look at these work instructions posted at a work station in the picking area.
What stories about standards does it tell us ?



Here's what I found interesting :
- they are posted at the workstation and visible for all, not filed away in a folder.
- work instructions (left) are supported with pictures
- employees working at the station must sign for accepting the new standards (right)
- work instructions have a limited validity (on the picture 17-8-2010) and must be reviewed by the station owner at fixed intervals.
- should the work instruction be removed, the label above signals the missing document

vrijdag 8 juli 2011

Use problem solving boards to monitor Lean culture

Recently, I visited the Scandinavian Solar subsidiaries and came across an interesting way to monitor the progress of lean culture throughout the company.

Traditionally, the adoption of the Solar Lean Way is measured in the annual employee survey. The survey measures the Lean awareness and employees' belief that the Solar Lean way contributes to serving the customers better and achieving the company's goals. Furthermore the survey includes questions on the lean leadership style of management. These are great measures at the start of a lean journey. However, these measures do not reflect the extend to which improvement activities are taking place throughout the company.

Let me describe how Solar is tracking the amount of continuous improvement activities as a proxy for "lean culture". Incremental improvements or point-kaizens take place on the gemba during meetings at the "lean problem solving boards". Here, teams discuss performance gaps and improvement opportunities on a weekly basis. Performance is measured and compared against goals. Any deviation from target (1) is addressed with rootcause problem finding and/or improvement suggestions (2). As the problem solving progresses (3,4,5), the boards keep track of the number of improvement actions in progress and the number of improvement actions closed (6,7).
( The number between brackets, refer to the numbers on the image below )




On a monthly basis, the number of improvement actions implemented (6) across all departments are aggregated on the regional lean board or country management lean board. Thus, an overview of the overall continuous improvement realisation is made visible and compared to target. On the image below, the red indicates that the continuous improvement goals within a particular location are not met. Hence, they are subject of a problem solving cycle on this board.



I'd love to hear if you have similar or other examples on how continuous improvement culture is tracked.

maandag 28 maart 2011

How to use influence to get things done

I enjoyed reading this article by Strategy+Business on how to use influence to get things done.
http://www.strategy-business.com/media/file/sb62_11104.pdf

Here are the five factors to use influence well:
1. Build up the courage to raise difficult problems
2. Leave your personal agenda at the door
3. Rise above the game, but don't ignore it
4. Engage the group using emotional intelligence
5. Be tenacious, because decisions do not guarantee actions

donderdag 3 maart 2011

Should managers know the content of work?

In a reaction to my previous post "No Problem is problem", Marco van Katwijk asked if  “a manager should have (the skills to acquire) an understanding of the actual work content, with the purpose of learning to see if problems are hidden?”  Marco, thank you for your question! I believe managers absolutely need an understanding of the actual work content. Here are my thoughts.

First, managing based on facts and observation is a key competency for supervisors and managers. This means managers go and study (genchi genbutsu) facts on the workfloor to support the team's problem solving processes. In my opinion, this behaviour requires an intrinsic interest in the actual work. By practising genchi genbutsu, a manager's understanding of the actual work content will naturally increase over time.

From my personal experience as a manager, I have always dug into the actual work content of problems critical to my team's performance. I kept involved in the actual work content to verify that my team members were building:
  1. understanding of their work and how it relates to that of others
  2. the capability to see problems
  3. skills to find true root-causes
  4. skills and discipline to verify that countermeasures were working
I believe that digging into the actual work content together with a team member during problem solving, is an opportunity for teaching and coaching them on these competencies. As over time, team members gradually develop these competencies, my involvement with their actual work content decreased.
The purpose of understanding the actual work content is to support the problem solving process and develop the competencies of the team. 
Secondly, by showing an interest in the actual work of the team and their problems, a manager demonstrates respect, builds a mutual understanding and a basis for trust. Building a work environment of mutual trust and support is probably the most important element to prevent people from "building walls to hide problems".
Showing interest in the work content builds mutual understanding and trust.
In summary, for a manager it is essential to understand the actual work content to a sufficient level of detail. The purpose of understanding the work content is one of supporting the problem solving process, developing competencies and building mutual trust.

dinsdag 15 februari 2011

No problem is problem

I just love the following image !  It's great for discussing some lean concepts with your team: e.g. the role of the manager, the mental model of "problems are gold", the importance of visualizing problems, the importance of continuous improvement.

Here are some questions to trigger people's thinking:
  1. Why does the person on the right (R) say there is no problem ?
  2. Why does the person on the left (L) accept his 'No problems!' answer ?
  3. Assuming that (L) is the manager, what does he do right ?
  4. What happens after the third image ? What culture and behavior are fostered ?

Here are some possible anwers:
  1. The wall hides (R)'s problems; (R) cannot see his problems. Maybe (R) has learned that it is better to hide problems because e.g. the messenger usually gets shot or gets instructions on what to do about ( i.e. get more work).  Maybe (R) even built that wall for that purpose ?
  2. (L) has no way of verifying that there no problems, as the problems are not visible.
  3. (L) is at the gemba and inviting (R) to talk about his problems. ( Note: Consider asking "What are your problems?" instead of  "Do you have any problems?" The first questions sets the expectation that there always are problems. )
  4. Everybody is firefighting everywhere, everyday.  Consequently, there is less and less time to prevent problems by eliminating root-causes.  The prevailing mindset becomes:  "our hero's are the firefighters" instead of "our hero's are the fire prevention team".
What additional learnings do you find in this picture ?

Source of image : unknown - pls. inform me if you know the author.

maandag 14 februari 2011

Lean Leadership Behaviour and Actions

Here is a simple pocket card which reminds us of lean management behaviour and actions.
Click image for quality viewing or printing.


Source : Lean Leadership - The Invisible Force  by Thomas Thorsted & Peter Knorst

dinsdag 8 februari 2011

Why do we need continuous improvement ?


Our business processes are constantly exposed to changes in the environment. These changes impact and deteriorate the effectiveness our company's processes. I like the analogy of a spider web: constant exposure to wind and rain causes filaments to break. (1)

Without continuous improvement.
If our staff is not trained on properly addressing the changes and their impact on our processes, they may not take any action or at best create workarounds to fix the problems (instead of addressing the root causes). Over time, problems and/or workarounds accumulate with increasing complexity and decreasing overall process performance as a result. It becomes more and more likely that another 'improvement project' will be required. Back to the analogy of the spider web: if the spider fails to repair the broken filaments frequently and systematically, big wholes will emerge in the web which render the web useless and leave the spider without food.

With continuous improvement.
Now take the scenario where staff is trained in continuous improvement and supported by their manager to address these problems on a daily basis. First, problems caused by changes in the environment will surface earlier because staff has 'learned to see' problems and is supported by visual management tools (e.g. visual process adherence, visual process performance). Second, the continuous improvement mindset encourages staff to bring up problems. ( cf. mental model "problems are gold" ) Thirdly, staff will address the problems using structured problem solving ( cf. A3 Thinking ). Not only will they identify and fix root causes, but also implement improved standards and monitoring. These problem solving activities can take place during stand-up meetings, quality circles and individual coaching by supervisors. Here's how continuous improvement fits the analogy of the spider: she repairs broken filaments on a daily basis to ensure that the quality of her food collection process is maintained. Last but not least, by implementing a system of continuous improvement, the performance of processes will not just be maintained to but also improved.

A spider repairs broken filaments in her web on a daily basis to ensure the quality of her food collection process is maintained


(1) Source of this analogy: "The Remedy", Pascal Dennis

maandag 7 februari 2011

Four building blocks for driving effective change.

Here's a nice visual representation of four building blocks for driving effective change. I particularly like the description of what happens when one of the building blocks is missing.


Source: unknown

The iceberg of sustainable lean management

Here's a great visual representation of the elements of sustainable lean management.